Contemporary Acrylic Bath Panel, Suitable for Standard Straight Baths - Gloss White
Contemporary Acrylic Bath Panel, Suitable for Standard Straight Baths - Gloss White is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Description
Description
Complete your bath installation with a clean, refined finish using this 1500mm front panel, designed to bring a seamless and polished look to your bathroom. Its simple, contemporary design helps create a cohesive space, neatly concealing pipework for a tidy and uncluttered feel.
Finished in a smooth gloss white, the panel reflects light beautifully to enhance brightness and openness within the room. The durable construction is made for everyday reliability, offering a practical solution that maintains its appearance with minimal upkeep.
Designed to pair effortlessly with compatible shower baths, this front panel ensures a streamlined installation that feels both complete and considered. It provides a precise fit while supporting a clean, professional finish that elevates the overall look of your bathing area.
Ideal for modern family bathrooms, en suites, or compact spaces, this panel brings together practicality and style in one simple addition. Pair with coordinating bath screens and brassware to create a cohesive bathroom design that feels calm, functional, and effortlessly put together.
Reviews
Reviews
Specification
Specification
Product Overview
| Brand | Balterley |
| SKU | BBSS302 |
| EAN | 5056211825029 |
| Category | Bathing > Accessories > Bath Panels |
| Style | Contemporary |
| Range | contemporary |
| Colour | White |
| Condition | New |
| Datasheet | Download PDF Datasheet |
Dimensions & Weight
| Dimensions | 167 x 500 x 1500mm |
| Width | 1500mm |
| Height | 500mm |
| Depth | 150mm |
| Weight | 2.8kg |
Materials & Construction
| Material | Acrylic |
| Finish | White |
| Made In | Turkey |
What's Included
| Includes | Front Bath Panel |
Warranty
| Guarantee | 5 Years |
Essential Extras
Essential Extras
FAQs
Delivery Questions
How much is delivery?
How much is delivery?
If you are ordering to a Mainland UK address, delivery is FREE
How long will it take to get my order?
How long will it take to get my order?
It is dependent on your location. Standard delivery to Mainland UK is 48 hours (Mon-Fri) from the point of order. So a purchase on Monday evening would be dispatched on Tuesday for Delivery on Wednesday.
Some areas of the UK may take an extra day or two, but you should be fully informed about where your package is throughout its journey.
Return Questions
How does the free 30-day return policy work?
How does the free 30-day return policy work?
When you order, we charge your credit card for the cost of the order. If, at the end of the 30-Days, you decide you don't want your order for whatever reason, simply put it back in its packaging, let us know you want to return it, and we'll take care of the rest, including refunding your money.
30 Day Free Returns
30 Day Free Returns
All of out products come with a free 30 days collection/returns from the date you receive them so long as they are in original packaging, you haven't damaged or installed them
![[BBSS302] Contemporary Acrylic Bath Panel, Suitable for Standard Straight Baths - Gloss White - Lifestyle 1](http://balterley.co.uk/cdn/shop/files/BBSS302_ls1.jpg?v=1778349059&width=1214)
![[BBSS302] Contemporary Acrylic Bath Panel, Suitable for Standard Straight Baths - Gloss White - Technical Drawing](http://balterley.co.uk/cdn/shop/files/BBSS302_ld.jpg?v=1778349063&width=1214)